Technicians embarked for passage, working the vessel's defect list under way instead of alongside.
A riding squad converts sea time into work time. The defect list that would otherwise wait for the next port — or the next docking — is executed on passage by technicians carried on board for that purpose.
The limits are real and are stated before mobilisation rather than after boarding. Hot work at sea is governed by the vessel’s own permit system and by what the cargo and the class allow. Some scopes cannot be executed under way, and Corvaden will say so at the quotation stage.
The Master retains control of the vessel and of every permit issued. Corvaden’s foreman reports to the Chief Engineer and to the owner, daily, in writing.
Capabilities
Deployment
- Embarkation and disembarkation at agreed ports
- Squad sized to the work list and the accommodation available
- Duration agreed before mobilisation
- Travel, visas and certification arranged before departure
Work under way
- Steel repair within permitted limits
- Pipe renewal and spool fitting
- Mechanical overhaul
- Surface preparation and coating
- Tank and void space work under permit
Control
- Work permits issued and held under the vessel's own system
- Daily progress reporting to the owner
- Interface with the Master and Chief Engineer
- Handover record at disembarkation
Composition
- Repair foreman
- Qualified welders and fitters
- Coating technicians
- Safety cover appropriate to the scope